    Where do I add non-energy additional costs to the total project summary?

    #4419
    Kendall Gross
    Keymaster

    We do have a way to add cost for non-energy items in OptiMiser however currently, the individual line items do not show up in the Improvement Table of the report. (Currently the cost will be correctly added to the total row of the improvement table however the individual line item will not show up.) The following instructions explain how you will be able to add non-energy items with costs to the report after we get the next update (version number should greater than 4.0.20384) out to you:

    In Wizard mode, click on the Wizard tab and select the Improvement Packages node (2nd node from the bottom) on the outline tree on the left of the interface. Next click the blue link that says, “Custom: Edit descriptions of improvements, add additional items, edit column headers for incentives, and select columns for the custom table”. In the top right of the interface, there are a set of buttons for “Columns:” and a set of buttons for “Rows:”. Click on the Row button that says “Added” and this will expose a number of blank rows you can edit the description and cost for.

    In Tabbed mode, go the the Improvements Tab, Custom Subtab. In the top right of the interface, there are a set of buttons for “Columns:” and a set of buttons for “Rows:”. Click on the Row button that says “Added” and this will expose a number of blank rows you can edit the description and cost for.

    Editing Descriptions
    The description you enter in the left most column (“Improvements”) is the text that will appear in the Improvement Table in the report.